
Page 10 of 14
11BConnecting the LOAD and Line Wires
1. Pass the power source wire through the right lower strain relief clamp, and connect the
wires to terminals labeled: LINE 1, LINE 2 and GROUND.
2. Tighten the screws on the strain relief clamps to secure the wires.
Figure 3-2 Location of LINE, LOAD and GROUND terminals
CAUTION!
Line 2 must be neutral for all 120V
installations.
WARNING!
Never operate the controller without proper
GROUND wiring.
Comentários a estes Manuais